80,000 square-foot single story brick building.
• Removal of 80,000 sq. ft. of various roofing systems and installation of all new metal decking.
• Replacement of failing roof membranes with Firestone mechanically-attached EPDM over 1/8” tapered Polyiso insulation.
• Fabrication and installation of .040 gauge Kynar finish copings and flashings.